Consider this deployment paradigm: The kiosk as a 'toaster'

September 6, 2012 by Craig Martin — Client Contact, Reality Interactive, LLC

The overall development process, from concept to pilot, may only take 10-14 weeks, but some of the decisions made at the beginning of the process are the most crucial. They can determine your costs and the amount of headaches you’ll have through deployment and over the life of the program.

Don't Think of Units as PC's

Let's cover the basics. Although most kiosks have PC's, they shouldn't be treated like PC units. They should be approached more like countertop appliances. When there is something wrong with your toaster, do you open it up and see whats going on? Probably not. So, why would you "open up" a kiosk CPU? No one should be allowed into the kiosk to make one-off changes. This applies to both the initial installation and during ongoing management. You want each unit to be as similar as possible in the field. Any tinkering to individual units during installation or afterward will increase your overall costs.

Most kiosk deployments we see are a patchwork. There may be different drivers, BIOS settings and even different hardware out in the field. Again, think of kiosks as toasters rather than remote PCs. Each unit should have the same hardware, the same wiring and the same software. Each unit's software configuration should be exactly the same across all the units. Without a doubt, multiple field configurations increase costs and support efforts. If all the units are identical it makes troubleshooting and remote management substantially more efficient. It takes discipline, but with this philosophy there is either a problem on all the field units, or it's a hardware problem on one specific unit. There is no in-between.

Plan ahead and reduce worries

Create a thorough plan for connectivity, power, shipping/receiving, field services support, help desk and other logistics. Managing deployment of units with sophisticated electronic technology isn't the same as managing a display/fixture campaign roll-out. While, there is a tendency to rush the shipping of units to the field, the overall goal is to have the unit in the field actually producing results.

Best practice for deployment includes the testing of all parts and functionality of units before they are shipped. The manufacturing process should include QC, test and setup of units before they are sent out for installation. Just think about it, if you have created a process that requires installers to assemble the units in the field, you will have increased variability which drives costs up.

Each installer will put things together differently, which will lead to more problems down the line. Your deployment process should be thoroughly planned upstream, meaning during the manufacturing process, or by developing an easy to use installation wizard. The installer should not have to improvise or make decisions on your behalf. Field installation should be swift, simple and obvious.

Apply insights and get started

First, you prototype your kiosk solution, next you pilot it and finally you roll-out multiple units. Throughout the deployment process, you'll learn things that can make your project better. Apply your insights to each subsequent stage of deployment and make the necessary cost-effective changes along the way.

Excellent results are born from thoughtful and thorough planning. The more work you do up-front, the more sleep you'll get, and the less overall cost you'll incur. With today’s low cost hardware, proven software and remote management technologies, every brand in every retail environment can plug in a few 'appliances' and start increasing sales today.

About Craig Martin

Craig Martin has over 15 years of experience providing Fortune 500 brands and retailers with innovative digital merchandising solutions. He founded Reality Interactive, LLC in 2004. Prior to that, he held senior business development positions at Media Right and Netkey. Clients over the years include BMW, Callaway Golf, PepsiCo, Bose, Lego, Leapfrog and others.